PIT WALLS AND OVERBURDEN DUMP STABILITY CALCULATION OF LUNEVSKY LIMESTONE DEPOSIT WESTERN SECTION. (2014). Proceedings of the YSU C: Geological and Geographical Sciences, 48(2 (234), 37-40. https://doi.org/10.46991/PYSU:C/2014.48.2.037